LG tender box
: This account does not have an active role assigned. Only public access allowed. February 23 2018, 12:07, Brisbane, Queensland

Display Tender MBRC007171

This page displays the details of a tender. See the detailed help in each section for specific information. help..
Narangba - New Settlement Road / Young Road Roundabout Upgrade
Issued By Moreton Bay Regional Council
Tender Type Request for Tender
Tender State Current Tender
Tender Code MBRC007171
Opening Date 10 Feb, 2018
Closing Date 7 Mar, 2018
Category 1 22100000 - Heavy construction machinery and equipment - (100%)
Contract No MBRC007171

Contacts  

Enquiries
Hennie Van der Schyff

Description

Narangba - New Settlement Road Young Road Roundabout Upgrade
The project scope includes modifying the eastern approach through reverse curves, modifying the eastern and western exits through reduced lane width, reduction of the roundabout circulating road width, provision of cycle lanes, drainage improvements and additional landscaping.

Responses  

Tender closes at 2:00 PM Brisbane time 7 March 2018

Click here to submit an electronic response

Narangba - New Settlement Road Young Road Roundabout Upgrade
The project scope includes modifying the eastern approach through reverse curves, modifying the eastern and western exits through reduced lane width, reduction of the roundabout circulating road width, provision of cycle lanes, drainage improvements and additional landscaping.

You must be logged in to submit a response.

Specification Documents  

Download Now  
Document Title Version File Type
01 101245 Narangba - New Settlement Road Young Road Roundabout Major Works Contract - AS2124 (Ver 1 - 8 Feb, 2018)
Available by Download
02 101245 Narangba - New Settlement Road Young Road Roundabout Conditions of Contract (Ver 1 - 8 Feb, 2018)
Available by Download
03 101245 Narangba - New Settlement Road Young Road Roundabout Construction Specification (Ver 3 - 8 Feb, 2018)
Available by Download
04 101245 Narangba - New Settlement Road Young Road - Construction Specifications (Ver 3 - 8 Feb, 2018)
Available by Download
04A 0176 Technical Specification for Supply (Ver 3 - 8 Feb, 2018)
Available by Download
04A 0177 Technical Specifications for Service (Ver 3 - 8 Feb, 2018)
Available by Download
04A 0179 General Requirements - Construction (Ver 3 - 8 Feb, 2018)
Available by Download
04A 0257 Landscape - Roadways and Street Trees (Ver 3 - 8 Feb, 2018)
Available by Download
04A 0319 Minor Concrete Works (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1101 Control of Traffic (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1102 Control of Erosion and Sedimentation (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1111 Clearing and Grubbing (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1112 Eartworks - Roadways (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1113 Stabilisation (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1121 Open Drains Including Kerb and Channel - Gutter (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1122 Kerb and Channel - Gutter Replacement (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1151 Road Openings and Restorations (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1152 Road Openings and Restorations - Utilities (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1163 Rigid Concrete and Road Safety Barrier System - Public Domain (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1171 Subsurface Drainage (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1172 Subsoil and Foundation Drains (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1173 Pavement Drains (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1191 Pavement Markings (Ver 1 - 8 Feb, 2018)
Available by Download
04A 1192 Signposting (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1193 Guide Posts (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1194 Non-Rigid Road Safety Barrier Systems - Public Domain (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1196 Street Lighting (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1351 Stormwater Drainage - Construction (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1352 Pipe Drainage (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1354 Drainage Structures (Ver 3 - 8 Feb, 2018)
Available by Download
04A 1424 Landscape - Maintenance (Ver 3 - 8 Feb, 2018)
Available by Download
06 Bill of Quantities.xlsm (Ver 2 - 8 Feb, 2018)
Available by Download
17-724-001 to 17-724-016 - New Settlement Road - Roundabout Improvements at Young Road (Ver 1 - 8 Feb, 2018)
Available by Download
S310 Supply of Dense Graded Asphalt (Ver 3 - 8 Feb, 2018)
Available by Download
S320 Laying of Asphalt (Ver 3 - 8 Feb, 2018)
Available by Download
Transport and Main Roads Specifications (Ver 3 - 8 Feb, 2018)
Available by Download
20180202 Rev B Preliminary Works Plan R0569116 New Settlement Rd, Narangba (Ver 1 - 12 Feb, 2018)
Available by Download
You must be logged in to download documents.

Online Tender Forum

The online forum provides a place to comment on the tender, and obtain further clarification if needed.
In order to submit a post you must be logged in, have downloaded specification documents for this tender and the tender must not be closed.
Please note that the use of the forum for supplier self-promotion is unacceptable and may result in the supplier having their account suspended. Such posts shall not be responded to or published on the forum.
We reserve the right to invite Tenderers to change their tenders as per Section 228(7) of the Local Government Regulation 2012
Downloaded documents may require one of the following free viewers to be viewed on your computer:
Get Acrobat Get Winzip Get 7zip Get Whip Get Word