Display Tender CHRC010359
This page displays the details of a tender. See the detailed help in each section for specific information.
Contacts
- PJ Cullivan
A sinkhole has formed beneath the dilapidated sewer pump station concrete slab located on Mackenzie Street in Blackwater. The sinkhole is approximately 5-6 meters deep and has formed due to damage at the interface of the existing sewer pipe and the abandoned pump station.
Central Highlands Regional Council (CHRC) requires a suitable Contractor to realign sewer pipes and to demolish and backfill the existing dilapidated pump station. Approximately 82m of new SewerMAX pipes are to be installed at an approximate depth of 3 meters as well as three new manholes (one with a drop inlet to 5m deep to connect to the existing sewer). The Contractor will also be required to ensure the existing sewer system is operational at all times using a bypass system.
Forum posts cannot be posted after 6 November 2020 02:00 PM
The online forum provides a place to comment and obtain further clarification if needed.
In order to submit or comment on a post you must be logged-in and have downloaded the documents.
Comments cannot be posted after 6 November 2020 02:00 PM.
Please note that the use of the forum for supplier self-promotion is unacceptable and may result in the supplier having their account suspended. Such posts shall not be responded to or published on the forum.
We reserve the right to invite Tenderers to change their tenders as per Section 228(7) of the Local Government Regulation 2012